Finalizing an Instrument Connection
Once the samples have been measured, the two exported files should be imported into CAPQ and the instrument connection finalized.
- Log into CAPQ
- Click on the user logo in the main menu
- Click on “Account”
- Click on Instruments
- Locate the instrument you are connecting (the instrument should be in a “Pending” state)
- Open the Options menu and click on “Connect”
- Verify that the “Connection Set ID” is the same as the one printed on the connection set measured
- Upload the A and B measurement files from your computer
- Verify the connection results by making sure that the average dE00 is within tolerance limits
- Finalize the instrument connection
- Optional: You can give the instrument a meaningful description, note and location by opening the Options menu and click on “Edit description”